Memorial Kitchen Remodel — Cost, Timeline & Process
$18,000–$85,000 per project
$18,000–$85,000 per project
A Memorial kitchen remodel starts with one scope question: does the layout stay put, or does a wall come down? No-layout-change projects — new cabinets and countertops in the existing footprint — start around $30,000. Add mid-grade quartz, tile backsplash, and semi-custom shaker cabinets and the mid-tier band runs $45,000–$60,000. Structural work — opening a galley kitchen, adding an island with new electrical and plumbing runs, or upgrading to waterfall-edge quartz and full-height backsplash — pushes premium-finish projects toward the top of our $18,000–$85,000 range. The build runs in stages: weeks 1–2 cover design and permit pull, week 3 is demo, weeks 4–5 overlap cabinet install with countertop fabrication in our Spring Branch shop, and the final week handles install, sink, backsplash, and a punch-list walkthrough. Wall removal adds a structural review and inspection cycle before framing starts, typically another 1–2 weeks on top of that schedule. Every phase runs through one crew: the same team that measures at the showroom fabricates the stone and installs on-site, so nothing stalls waiting on a subcontractor's own schedule or lead time.
Prices shown are estimates for typical Memorial jobs. Actual cost depends on job complexity, materials, and permit requirements.
Visit the showroom or call — we answer during business hours.
Call or text · Showroom + Fabrication(832) 569-8899